Proposed Airspace
|
||
The following links will outline the proposed airspace, maps, LOA's, and local procedures. This is an ongoing proposal and some details will change. Be patient if you encounter dead links or outdated material. I will update as frequently as possible.
Proposed Airspace Changes: This will describe the actual proposal and suggested benifits and/or drawbacks.
Radar and Video Maps: Both current and proposed maps will be available.
AMA/ZAB LOA: All proposed changes will be in red.
AMA Local Procedures: These changes also include the proposed re-sectorization (Final Control) of AMA.